Separate apps for the cameras, alarm, gate and inverter mean nothing talks to anything — and load-shedding, false alarms and wasted power still need someone to react by hand.
Security systems
Smart Homes and Automation
Smart home design and installation — lighting, curtains, air-conditioning, CCTV, alarm, gate, solar backup and water controlled from one app, with automations that run the house for you.

One app and one set of wall keypads for every light, curtain, AC, camera, gate, the alarm, solar power and water.
A planned, wired-in system where the house reacts on its own: lights at sunset, the gate opening for a recognised car, geysers heating on solar and essentials kept on through load-shedding.
What this service can include.
The final specification follows assessment and only includes equipment or work required by the agreed scope.
What you get.
The results this service is designed to deliver for the people who use it every day.
Every system in one app and on the walls
Automations for sunset, arrival, bedtime and load-shedding
Planned and wired before the plaster goes on
How we deliver this service.
A clear stage-by-stage path — you know the plan and the cost before each commitment.
- 01
Brief and drawings
Start from the architect's plans and how the family will actually live in the house.
- 02
3D digital twin
Model the house and every device so the client can walk through and test the system before building.
- 03
Design and specification
Fix device positions, cabling routes by construction stage, power and network diagrams and the bill of materials.
- 04
First-fix cabling
Install conduits, cables and back boxes at the right construction stage.
- 05
Install and programme
Fit devices, programme scenes and automations, and connect security, solar and network systems.
- 06
Handover and support
Train the family, hand over the app and drawings, and stay on call for changes.
See this service in action.
Published projects directly connected to this service.
Plan smart homes around the complete requirement.
Share the environment, existing systems and intended outcome before equipment or implementation is proposed.
